Skip to content

S and T ControlsCase study · Controls & PLC

Body Shop Cell PLC & HMI Programming

Developing and debugging Studio 5000 PLC and HMI programs for five automotive body shop cells.

My role
Project Controls Engineer
Timeframe
S and T Controls · Mar 2023 – Jul 2023
Team / context
S and T Controls, Kitchener, ON, Canada
Tech stack
Allen-Bradley Studio 5000 · PLC · HMI · Wiring diagrams · Schematics

01

Overview

At S and T Controls I developed and debugged the Studio 5000 PLC and HMI programs for five body shop cells, and verified their wiring diagrams.

Body shop cells build the vehicle's structure. Their PLC logic sequences the equipment, their HMI lets people run and recover them, and their wiring diagrams tie it all to physical hardware.

I worked from each automated process's scope and requirements, reviewed the wiring diagrams and schematics of the automated cells, debugged logic errors and faults in Studio 5000, and coordinated with senior engineers and the project manager to deliver the project on time.

02

The problem & objective

Five body shop cells needed working control software and accurate electrical documentation.

03

My role & responsibilities

Project Controls Engineer. Delivered as part of my role as Project Controls Engineer at S and T Controls.

  • Develop PLC programs in Studio 5000 for 5 body shop cells
  • Develop HMI programs for the same cells
  • Debug logic errors and faults in the PLC and HMI programs
  • Review and verify the cells' wiring diagrams and schematics
  • Work from each automated process's scope and requirements
  • Coordinate with senior engineers and the project manager

04

Approach & process

  1. Understand the process

    Start from each automated process's scope and requirements.

  2. Develop the PLC logic

    Program each cell in Allen-Bradley Studio 5000.

  3. Develop the HMI

    Build the operator interface for each cell.

  4. Debug

    Find and fix issues in the PLC and HMI programs.

  5. Verify wiring diagrams

    Check the wiring diagrams so hardware and software agree.

  6. Coordinate delivery

    Work with senior engineers and the project manager to keep the project on schedule.

05

Key features & deliverables

  • PLC programs

    Studio 5000 programs for 5 body shop cells.

  • HMI programs

    Operator interfaces for the same 5 cells.

  • Verified wiring diagrams

    Wiring diagrams verified for all 5 cells.

06

Challenges & how I solved them

ChallengeHow I solved it
Software and hardware must matchVerifying the wiring diagrams alongside developing the programs keeps the logic and the physical wiring consistent.

07

Results & impact

  • PLC and HMI programs developed and debugged for 5 body shop cells
  • Wiring diagrams verified for all 5 cells

08

Skills demonstrated & lessons learned

Skills demonstrated: Studio 5000 · PLC programming · HMI development · Debugging · Electrical documentation

Controls software is only as reliable as the documentation underneath it.